Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsPlastic Bottle Mould

Stainless Steel Plastic Preform Mould , Water Bottle Mold With 3D / 2D Drawing

Good quality Automatic Blowing Machine for sales
Eceng macinery is a good company, machine is stable, we will keep copperate

—— Mr.Osman

we have purchased 7 sets machien from Eceng

—— patt

I'm Online Chat Now

Stainless Steel Plastic Preform Mould , Water Bottle Mold With 3D / 2D Drawing

China Stainless Steel Plastic Preform Mould , Water Bottle Mold With 3D / 2D Drawing supplier
Stainless Steel Plastic Preform Mould , Water Bottle Mold With 3D / 2D Drawing supplier Stainless Steel Plastic Preform Mould , Water Bottle Mold With 3D / 2D Drawing supplier

Large Image :  Stainless Steel Plastic Preform Mould , Water Bottle Mold With 3D / 2D Drawing

Product Details:

Place of Origin: China
Brand Name: Eceng
Certification: CE&SGS&ISO

Payment & Shipping Terms:

Minimum Order Quantity: 1set
Price: Negotiable
Packaging Details: Film pack
Delivery Time: 30 working days
Payment Terms: L/C, T/T, Western Union
Supply Ability: 10sets per month
Contact Now
Detailed Product Description
Product Material: Steel Mould Life: 3 To 5 Million Shots
Design Software: UG, PROE, CAD Neck Size And Volume: Customized
Surface Treatment: Mirror Polish Warranty: 1 Year

High Quality Plastic pet preform mold/water bottle preform molds/plastic bottle mould
 

Name

Description
Mould material45#, P20, 718, 2738, S136 etc.
Mould baseC45#, LKM, HASCO etc.
CavitySingle / Multi-cavity
RunnerHot / Cold
Mould design3D / 2D Drawing
Design days2-3 days
Design softwareUG,PROE,CAD,CAE,CAM,CAXA ect
Plastic materialPET,PP,PE,ABS,PS,PC, etc.
Mould life3,000,000 shots
Packing detailwaterproof film & painted anti-rust oil put in Wooded case
Polish systemMirror polish
PaymentT/T, 50% deposit , 50% before shipment
Delivery time10-15 days
SpecificationDepends on customers requirements

 
Business Step:
 

1. R&DWe support customer R&D. Make the files or improve the design if you needed
2. QuotationQuotation will according to our customer information
3. NegotiationThe quality, price, material, delivery time. payment item ect.
4. Mould Design3-5 days for mould and product 3D/2D drawing design

 
5. Mould

According to customers' request to build the mould. Before make the mould ,
we send mould design to customer approval first .
Mould will be usually finished in 10-15 days

 
6. Mould Testing

When mould are finished, we will test the mould to check it and send the sample for consumers' reference.

 
7. Sample

If the first sample come out is not satisfied with customer needed .we modify the mould and until meet customers satisfactory
8. DeliveryDelivery goods by sea or by air, according to customers requirement

 
Mould Maintenance:
♦ Thermal oil: adopting the hydraulic oil for the maintenance to get in the inlet of cooling water, which can play a lubrication, rust-proof role.
♦ Maintenance of guiding column: guiding column should be painted a small amount of hydraulic oil, cycle once a month.
♦ It needs to be painted rust preventive if it stops production for long time.
Stainless Steel Plastic Preform Mould , Water Bottle Mold With 3D / 2D Drawing

Contact Details
Zhangjiagang Eceng Machinery Co.,Ltd

Contact Person: Derrick

Send your inquiry directly to us (0 / 3000)