Home ProductsPlastic Bottle Mould

Stainless Steel Plastic Preform Mould , Water Bottle Mold With 3D / 2D Drawing

Stainless Steel Plastic Preform Mould , Water Bottle Mold With 3D / 2D Drawing

    • Stainless Steel Plastic Preform Mould , Water Bottle Mold With 3D / 2D Drawing
    • Stainless Steel Plastic Preform Mould , Water Bottle Mold With 3D / 2D Drawing
  • Stainless Steel Plastic Preform Mould , Water Bottle Mold With 3D / 2D Drawing

    Product Details:

    Place of Origin: China
    Brand Name: Eceng
    Certification: CE&SGS&ISO

    Payment & Shipping Terms:

    Minimum Order Quantity: 1set
    Price: Negotiable
    Packaging Details: Film pack
    Delivery Time: 30 working days
    Payment Terms: L/C, T/T, Western Union
    Supply Ability: 10sets per month
    Contact Now
    Detailed Product Description
    Product Material: Steel Mould Life: 3 To 5 Million Shots
    Design Software: UG, PROE, CAD Neck Size And Volume: Customized
    Surface Treatment: Mirror Polish Warranty: 1 Year

    High Quality Plastic pet preform mold/water bottle preform molds/plastic bottle mould
     

    Name

    Description
    Mould material45#, P20, 718, 2738, S136 etc.
    Mould baseC45#, LKM, HASCO etc.
    CavitySingle / Multi-cavity
    RunnerHot / Cold
    Mould design3D / 2D Drawing
    Design days2-3 days
    Design softwareUG,PROE,CAD,CAE,CAM,CAXA ect
    Plastic materialPET,PP,PE,ABS,PS,PC, etc.
    Mould life3,000,000 shots
    Packing detailwaterproof film & painted anti-rust oil put in Wooded case
    Polish systemMirror polish
    PaymentT/T, 50% deposit , 50% before shipment
    Delivery time10-15 days
    SpecificationDepends on customers requirements

     
    Business Step:
     

    1. R&DWe support customer R&D. Make the files or improve the design if you needed
    2. QuotationQuotation will according to our customer information
    3. NegotiationThe quality, price, material, delivery time. payment item ect.
    4. Mould Design3-5 days for mould and product 3D/2D drawing design

     
    5. Mould

    According to customers' request to build the mould. Before make the mould ,
    we send mould design to customer approval first .
    Mould will be usually finished in 10-15 days

     
    6. Mould Testing

    When mould are finished, we will test the mould to check it and send the sample for consumers' reference.

     
    7. Sample

    If the first sample come out is not satisfied with customer needed .we modify the mould and until meet customers satisfactory
    8. DeliveryDelivery goods by sea or by air, according to customers requirement

     
    Mould Maintenance:
    ♦ Thermal oil: adopting the hydraulic oil for the maintenance to get in the inlet of cooling water, which can play a lubrication, rust-proof role.
    ♦ Maintenance of guiding column: guiding column should be painted a small amount of hydraulic oil, cycle once a month.
    ♦ It needs to be painted rust preventive if it stops production for long time.
    Stainless Steel Plastic Preform Mould , Water Bottle Mold With 3D / 2D Drawing

    Contact Details
    Zhangjiagang Eceng Machinery Co.,Ltd

    Contact Person: Derrick

    Send your inquiry directly to us (0 / 3000)

    Contact

    Address: Xitang Road On The 18th,Xizhang Town,Zhangjiagang,Suzhou City,Jiangsu Province,China

    Factory Address:Xitang Road On The 18th,Xizhang Town,Zhangjiagang,Suzhou City,Jiangsu Province,China